In winter of 2012 we had to install M400 mast on a steel depot made of sandwitch pannels. This delicate construction made us create a set of supports transfering forces down to the building frame. Take a look at our gallery to see proposed solution.
Altruss took part in interesting collaboration between JAZ Architekten and Museum of Polish History to create art displays for museum's outdoor anniversary show. Gallery shows steps that led from concept sketches to phisycal execution of final product.
We have adapted off-the-shelf solution of T1000-25 tower to quite new use, that is a crossroads cross in Rozdroze village for a local parish. We have never done that before, so it was quite a challenge. Everything went okay. Now the cross-tower got 3KW of lighing and looks outstandng.
In 2013 we had oportunity to cooperate with Lithuanian design studio and construction company on making all-aluminum facade for office building in Vilnus. Sample before paint job is shown in the gallery